2024-06-25
The project is located in Fusheng Electric Appliance Factory in Fuyang District, Hangzhou City. It has a scale of 4MW/8MWh. The project uses aluminum-cased single cells rated at 3.2V/280Ah. They are assembled using laser welding technology to form a PACK. The battery module configuration is 1P16S/51.2V/280Ah, with a rated capacity of 14.336kWh. 23 battery module clusters in series form 1 set, with a total energy of 329.728kWh.
The battery system of this project comprises 2 containers, each with 12 sets. Six sets correspond to 1 battery unit and 1 control cabinet. One container houses 2 battery units, each connected to a 2000KW PCS (Power Conditioning System). Both containers, totaling 2 battery units, are connected to 2 2000KW PCS, with a total capacity of 7913.472kWh.